Home

About Us

Certifications

Services

Projects

Application

Contact

Services
Drainage structures, utility structures and manholes work:
Temporarily lower structures to allow for milling of existing road surface
Raise Structures to new elevation prior to resurface of road
Install HDPE Structure adjustment rings and East Jordan Infra-Riser Rings
Install External Structure Wrap
Reconstruct damaged or failed structures as required by MDOT
Perform similar operations on valves/boxes for other utilities in roadway









Miscellaneous Concrete Work:
Remove and replace curbs/gutter, walks, drive approaches, and ADA ramps
Remove and replace concrete base roadway in patches prior to repaving
Miscellaneous Concrete site work: footings, generator pads and small floors
Home
About Us
Certifications
Projects
Services
Contact